Projects & Engagements

Real-World IT Challenges We've Solved

From datacenter migrations to end-user device management, here are the types of projects our team delivers for clients every day.

Infrastructure

Datacenter Migration

Physical relocation and re-racking of servers, storage arrays, and networking equipment across sites with zero unplanned downtime. Includes pre-migration audits, cable management, IP re-addressing, and post-migration validation.

Server Re-racking IP Re-addressing Hardware Audit Post-migration Testing
Cloud

OnPrem to Cloud Migration

End-to-end lift-and-shift and re-platform migrations to Microsoft Azure, AWS, and Google Cloud. Workload assessment, dependency mapping, phased cutover planning, and VMware / Hyper-V to cloud conversions.

Azure & AWS VMware to Cloud Phased Cutover Cost Optimisation
Microsoft 365

Microsoft 365 Email Migrations

Cutover, staged, and hybrid migrations from on-premises Exchange, G Suite, or legacy IMAP hosts to Microsoft 365. Full mailbox, calendar, and contact data migration with minimal disruption to end users.

Exchange to M365 G Suite to M365 Hybrid Migration DNS & MX Cutover
Endpoint

Device Management via Microsoft Intune

Enrolment and policy management for Windows, macOS, iOS, and Android endpoints. Conditional access policies, compliance baselines, app deployment, and Autopilot provisioning.

Windows & macOS MDM Autopilot Conditional Access App Deployment
Systems

Linux & Windows Server Investigations

Root-cause analysis and remediation for performance issues, service failures, disk and memory problems, kernel panics, and event log anomalies on RHEL, Ubuntu, and Windows Server 2016–2022.

RHEL / Ubuntu Windows Server 2016–2022 Performance Tuning Incident Response
Networking

Firewalls, Switches & Access Points

Hardware upgrades, replacements, and firmware lifecycle management. Site-to-site VPN (S2S) across Cisco, Fortinet, Juniper, Ubiquiti, and Meraki platforms. VLAN segmentation, QoS, and wireless coverage planning.

S2S VPN Fortinet / Cisco / Meraki VLAN & QoS Firmware Upgrades
Case Studies

Outcomes That Speak for Themselves

A closer look at three engagements — the problem, what we did, and the measurable result.

Infrastructure

Legacy Server Migration & AD Cleanup — Manufacturing Firm

The Problem

A 120-user manufacturing company was running Windows Server 2008 R2 domain controllers past end-of-life, with an Active Directory that had accumulated 400+ stale computer accounts and outdated group policies over 8 years.

What We Did

Deployed two new Windows Server 2022 domain controllers remotely, migrated FSMO roles, cleaned 400+ stale objects, restructured OU hierarchy, and decommissioned legacy DCs — all during scheduled maintenance windows with zero production impact.

The Result

0Unplanned downtime hours
400+Stale AD objects removed
100%Compliance with MS Secure Baseline
Cloud

On-Premises to Azure Migration — Healthcare Diagnostics

The Problem

A diagnostics clinic running patient data on aging on-premises servers faced audit findings around backup failures and missing encryption at rest. Recovery time after a test restore was over 6 hours.

What We Did

Migrated workloads to Azure using Azure Migrate, configured Azure Backup with geo-redundant storage, enabled encryption at rest and in transit, set up MFA and Conditional Access in Entra ID, and produced audit-ready documentation.

The Result

45 minRTO (down from 6 hours)
0Audit findings post-migration
32%Lower infra cost vs. on-prem
Networking

Multi-Site Network Standardisation — Logistics Operator

The Problem

A logistics company with 3 warehouse sites had flat, unsegmented networks — servers, CCTV, and user devices shared the same VLAN. Recurring ransomware alerts, no site-to-site VPN, and 4 unplanned outages in 12 months.

What We Did

Remotely reconfigured Fortinet FortiGate firewalls at each site, implemented VLAN segmentation (user / server / IoT / CCTV), set up encrypted site-to-site IPSec VPN, deployed FortiEDR on all endpoints, and enabled centralised log monitoring via FortiAnalyzer.

The Result

0Network outages in 12 months after
100%East-west traffic segmented
3 sitesUnified under central monitoring

Have a Similar Project in Mind?

Tell us about your environment and we'll put together a tailored plan of action.